Customer saves $1.9MM on 6-Well Pad
ProDirectional Delivers Exceptional Results: 6-Well Pad Success
At ProDirectional, we take on the most challenging drilling projects and turn them into remarkable success stories. This 6-Well pad is no exception: with 2 Kk laterals, 4 6K laterals, and a science pilot hole well.
Now, we could have just made a standard “record well post”. With a big foot/day number (it was big and impressive). We could’ve told you that it was an operator record, basin record, etc. But instead, let’s dig into the details that really matter.
- Completed Ahead of Schedule: Our dedicated team worked tirelessly, completing the pad 9.7 days faster than planned, resulting in substantial cost savings of $1.9 million, an impressive 13% under the planned budget.
- Overcoming Complexities: These laterals presented unique challenges with over 250 feet of vertical throws and more than 38 degrees of plan changes in the lateral alone, all due to several geological faults.
This achievement underscores ProDirectional’s unwavering commitment to innovation, precision, and excellence. We are proud of our team’s expertise in navigating complex drilling environments and delivering exceptional results for our clients.
Thank you to our dedicated team and valued clients for making this success possible. ProDirectional continues to set the standard in directional drilling excellence.